{"id":1101,"date":"2025-02-18T11:10:14","date_gmt":"2025-02-18T03:10:14","guid":{"rendered":"https:\/\/zhengrui-electric.com\/municipal-pole-relocation-partial-performance_nanjing-zhengrui\/"},"modified":"2025-04-24T11:13:06","modified_gmt":"2025-04-24T03:13:06","slug":"municipal-pole-relocation-partial-performance_nanjing-zhengrui","status":"publish","type":"post","link":"https:\/\/www.zhengrui-electric.com\/de\/municipal-pole-relocation-partial-performance_nanjing-zhengrui\/","title":{"rendered":"St\u00e4dtische Mastverlegung Teilleistung_Nanjing Zhengrui"},"content":{"rendered":"<p>[Nanjing Jiangbei Environmental Protection Industry Development Co., Ltd. 35-kV-Kraftwerk #1 und #2: Projekt zur Migration der Polleitungen<\/p>\n<p>(Guogang E-commerce Technology Co., Ltd.) Nanjing Jiangning Economic and Technological Development Group Co. \"10KV Sijia Leitung und 10KV Taiwan Division Leitung 01-14 Polverlegungsprojekt\"<\/p>\n<p>[Projekt zur Verlegung von Stromleitungsmasten an der Feixi Youth Road (Jinzhai Road-Tan Chong Road)<\/p>\n<p>[Nanjing Jiangbei New District Utility Tunnel Phase II Puyun-Leitung, Four Seasons #2-Leitung, Lixin-Leitung und andere 11 Projekte zur Verlegung von Leitungsmasten - Au\u00dfenringnetzschrank<\/p>\n<p>[Nanjing Yuaneng Electric Power Engineering Co., Ltd. Zweigstelle Pukou] 10kV Pufa #1 und #2 Leitung 03-09 Polwanderungsprojekt - Unterauftragsvergabe Tiefbau<\/p>\n<p>[Projekt zur Verlegung der 10-kV-Meteorologieleitung und der Masten der Obstgartenleitung der Nanjing Southern New Town Development and Construction (Group) Co.<\/p>\n<p>(Nanjing China Shipbuilding Oasis Machinery Co., Ltd.) Projekt zur Verlagerung des Pols von Nanjing China Shipbuilding Oasis Machinery Co., Ltd.<\/p>\n<p>[Projekt zur vor\u00fcbergehenden Verlegung von 10-kV-Masten an der Kreuzung der Jinzhai South Road und der Wuxian Road in der Stadt Huagang, Kreis Feixi<\/p>\n<p>(Xingsha Electric Power Engineering Branch of Hunan Xingdian Group Co., Ltd.) Xianglong Sub-district Office of Changsha County: Projekt zur Verlegung der 10KV-Teichleitung und der oberen Stromleitung 001-023 an der Wangxin Road (Waidaohe Road-Panlong Road)<\/p>\n<p>[Nanjing Anengjie Electric Power Industry Co., Ltd. Nanjing Hengda Fufeng Real Estate Co., Ltd. 10kV Bay North Line Evergrande Branch Line 8#-12# Mastverlegungsprojekt - Tiefbau\/Rohrzug<\/p>\n<p>(Nanjing Huaqun Energy Group Co., Ltd. Science and Trade Branch) Nanjing Urban and Rural Water 10kV Xishan Line Pole Relocation Project<\/p>\n<p>[Projekt zur Verlegung und Installation von 10-kV-Masten f\u00fcr die Ausschreibungsabschnitte 3 und 4 des Baus der Ligao Schnellstra\u00dfe<\/p>\n<p>(Wuhu Mingyuan Group Co., Ltd.) Wuhu Jinghu District 2022 Old Residential Area Reconstruction and Supporting Road Pole Relocation Project<\/p>\n<p>[10kv Laofeng 16 Leitung #29-32 Projekt zur Migration der Masten (Anqing Development Zone Electric Power Co., Ltd.)<\/p>","protected":false},"excerpt":{"rendered":"<p>[Nanjing Yuaneng Electric Power Engineering Co., Ltd.] Nanjing Jiangbei Environmental Protection Industry Development Co., Ltd. 35kV Power Plant #1 and #2 Pole Line Migration Project [Guogang E-commerce Technology Co., Ltd.] Nanjing Jiangning Economic and Technological Development Group Co., Ltd. &#8220;10KV Sijia Line and 10KV Taiwan Division Line 01-14 Pole Relocation Project&#8221; [Feixi Branch of Hefei [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1103,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1101","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-engineering-case"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/posts\/1101","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/comments?post=1101"}],"version-history":[{"count":0,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/posts\/1101\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/media\/1103"}],"wp:attachment":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/media?parent=1101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/categories?post=1101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/tags?post=1101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}