{"id":1102,"date":"2025-02-18T11:10:14","date_gmt":"2025-02-18T03:10:14","guid":{"rendered":"https:\/\/zhengrui-electric.com\/state-grid-class-1-state-grid-power-transmission-and-transformation_nanjing-zhengrui\/"},"modified":"2025-04-24T11:13:07","modified_gmt":"2025-04-24T03:13:07","slug":"state-grid-class-1-state-grid-power-transmission-and-transformation_nanjing-zhengrui","status":"publish","type":"post","link":"https:\/\/www.zhengrui-electric.com\/de\/state-grid-class-1-state-grid-power-transmission-and-transformation_nanjing-zhengrui\/","title":{"rendered":"Staatsnetz Klasse 1-Staatsnetz Strom\u00fcbertragung und -umwandlung_Nanjing Zhengrui"},"content":{"rendered":"<p>[State Grid Jiangsu] Projekt zur Erweiterung des Haupttransformators Nr. 2 der 110-kV-Umspannstation in Shicun<\/p>\n<p>[State Grid Jiangsu] Jiangsu Nanjing Fengxiang 110kV Umspannwerk Nr.1 Haupttransformator Wiederaufbau Projekt General Contracting<\/p>\n<p>[State Grid Jiangsu] Wiederaufbau des 110-kV-Leistungsschalters des 110-kV-Wanshou-Transformators in Nanjing<\/p>\n<p>[State Grid Jiangsu] Nanjing 110kV Dongshan Umspannwerk Umfassende Selbsttransformation<\/p>\n<p>[State Grid Jiangsu] Nanjing 110kV Baguazhou Transformator #1 Haupttransformator und #1 und #2 Kondensatorb\u00e4nke Ersatz<\/p>\n<p>[State Grid Jiangsu] Nanjing Lishui Betrieb und Wartung von 110kV Honglan Transformator, Jingqiao Transformator und Wushan Transformator AC-Schirm entfernen<\/p>\n<p>[State Grid Jiangsu] State Grid Jiangsu Nanjing Gaochun 35kV Lion Tree Transformator Selbsterneuerung<\/p>\n<p>[State Grid Jiangsu] State Grid Jiangsu Nanjing 35kV Bridge Forest Umfassende Selbsttransformation<\/p>\n<p>[State Grid Jiangsu] Lishui 35kV Dongping Transformator 10kV Freilufttrennschalter Reparatur<\/p>\n<p>[State Grid Jiangsu] 35kV Qin Xian und Yongning Umspannwerk #1#2 Haupttransformator Zuweisung Reparatur<\/p>\n<p>[State Grid Jiangsu] State Grid Nanjing Power Supply Company Lishui 35kV Zhetang Substation Umfassende Selbsterneuerung<\/p>\n<p>[State Grid Jiangsu] State Grid Jiangsu Nanjing 35kV Longpao Transformator 10kV Schaltschrank Austausch<\/p>\n<p>[State Grid Jiangsu] Jiangsu Nanjing Fisherman's Song ~ Baima 110 kV Leitungsturmverriegelungsprojekt<\/p>\n<p>(State Grid Jiangsu Electric Power Co., Ltd. Nanjing Lishui District Power Supply Branch] State Grid Jiangsu Nanjing 2020 Lishui 110kV und darunter Umspannwerk Produktion technische Renovierung und \u00dcberholung Bauvorhaben Rahmenprojekt<\/p>\n<p>(State Grid Jiangsu Electric Power Co., Ltd. Nanjing Lishui District Power Supply Branch] State Grid Jiangsu Nanjing 2021 Lishui 110kV und niedriger Transmission Production Technical Transformation Overhaul Construction Project Rahmenprojekt<\/p>\n<p>(State Grid Jiangsu Electric Power Co., Ltd. Nanjing Lishui District Power Supply Branch] State Grid Jiangsu Nanjing 2022 Lishui 110kV Power Transmission and Transformation Production Technical Transformation Overhaul Construction Framework<\/p>\n<p>(State Grid Jiangsu Electric Power Co., Ltd. Nanjing Power Supply Branch) State Grid Jiangsu Nanjing 2022 110kV Transmission Production Technical Transformation Overhaul Construction Project Rahmenprojekt<\/p>\n<p>(Wartungsabteilung der State Grid Jiangsu Electric Power Co., Ltd.) State Grid Jiangsu Nanjing 2018 220kV Yin Xiang Transformer 110kV Interval Circuit Breaker Replacement<\/p>\n<p>(Nanjing Yuanneng Electric Power Engineering Co., Ltd.) 110kV Orchid Transformator Kapazit\u00e4tserweiterung Generalunternehmer Projekt<\/p>","protected":false},"excerpt":{"rendered":"<p>[State Grid Jiangsu] No. 2 Main Transformer Expansion Project of 110 kV Substation in Shicun [State Grid Jiangsu] Jiangsu Nanjing Fengxiang 110kV Substation No.1 Main Transformer Reconstruction Project General Contracting [State Grid Jiangsu] 110kV Circuit Breaker Reconstruction of Nanjing 110kV Wanshou Transformer [State Grid Jiangsu] Nanjing 110kV Dongshan Substation Comprehensive Self-transformation [State Grid Jiangsu] Nanjing [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1105,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1102","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-engineering-case"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/posts\/1102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/comments?post=1102"}],"version-history":[{"count":0,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/posts\/1102\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/media\/1105"}],"wp:attachment":[{"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/media?parent=1102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/categories?post=1102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/de\/wp-json\/wp\/v2\/tags?post=1102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}