{"id":1101,"date":"2025-02-18T11:10:14","date_gmt":"2025-02-18T03:10:14","guid":{"rendered":"https:\/\/zhengrui-electric.com\/municipal-pole-relocation-partial-performance_nanjing-zhengrui\/"},"modified":"2025-04-24T11:13:06","modified_gmt":"2025-04-24T03:13:06","slug":"municipal-pole-relocation-partial-performance_nanjing-zhengrui","status":"publish","type":"post","link":"https:\/\/www.zhengrui-electric.com\/es\/municipal-pole-relocation-partial-performance_nanjing-zhengrui\/","title":{"rendered":"Desempe\u00f1o parcial del traslado de los postes municipales_Nanjing Zhengrui"},"content":{"rendered":"<p>Nanjing Jiangbei Environmental Protection Industry Development Co., Ltd. [Nanjing Yuaneng Electric Power Engineering Co. Proyecto de migraci\u00f3n de los postes #1 y #2 de la central el\u00e9ctrica de 35 kV<\/p>\n<p>[Guogang E-commerce Technology Co., Ltd.] Nanjing Jiangning Economic and Technological Development Group Co., Ltd. \"Proyecto de reubicaci\u00f3n de postes de la l\u00ednea Sijia de 10KV y la l\u00ednea 01-14 de la divisi\u00f3n Taiw\u00e1n de 10KV\"<\/p>\n<p>[Proyecto de reubicaci\u00f3n de los postes de la l\u00ednea de alimentaci\u00f3n el\u00e9ctrica de la Carretera de la Juventud de Feixi (Carretera de Jinzhai-Carretera de Tan Chong)<\/p>\n<p>[Nanjing Heyuan Electric Power Industry Co., Ltd.] Nanjing Jiangbei New District t\u00fanel de servicios p\u00fablicos Fase II L\u00ednea Puyun, L\u00ednea Four Seasons #2, L\u00ednea Lixin y otros 11 proyectos de reubicaci\u00f3n de postes de l\u00ednea-armario de red de anillo exterior<\/p>\n<p>[Nanjing Yuaneng Electric Power Engineering Co., Ltd. Sucursal de Pukou] Proyecto de migraci\u00f3n de postes de las l\u00edneas 03-09 de 10 kV Pufa #1 y #2-Subcontrataci\u00f3n de ingenier\u00eda civil<\/p>\n<p>Proyecto de reubicaci\u00f3n de postes de la l\u00ednea meteorol\u00f3gica de 10 kv y de la l\u00ednea de huertos de Nanjing Southern New Town Development and Construction (Group) Co., Ltd. [Nanjing Suyi Industry Co., Ltd.].<\/p>\n<p>[Nanjing China Shipbuilding Oasis Machinery Co., Ltd.] Proyecto de reubicaci\u00f3n de polos de Nanjing China Shipbuilding Oasis Machinery Co.<\/p>\n<p>[Hefei Electric Power Installation Co., Ltd. Feixi Branch] Proyecto de Reubicaci\u00f3n Temporal de Postes de 10kv en la Intersecci\u00f3n de Jinzhai South Road y Wuxian Road en Huagang Town, Condado de Feixi.<\/p>\n<p>[Xingsha Electric Power Engineering Branch of Hunan Xingdian Group Co., Ltd.] Oficina del Subdistrito Xianglong del Condado de Changsha: Proyecto de reubicaci\u00f3n de postes de la l\u00ednea de estanque de 10KV y de la l\u00ednea el\u00e9ctrica superior 001-023 de la carretera Wangxin (carretera Waidaohe-carretera Panlong)<\/p>\n<p>[Nanjing Anengjie Electric Power Industry Co., Ltd.] Nanjing Hengda Fufeng Real Estate Co., Ltd. 10kV Bay North Line Evergrande Branch Line 8#-12# Pole Relocation Project-Civil Engineering\/Pipe Pull<\/p>\n<p>[Nanjing Huaqun Energy Group Co., Ltd. Science and Trade Branch] Proyecto de reubicaci\u00f3n de postes de la l\u00ednea Xishan de 10 kV de agua urbana y rural de Nanjing<\/p>\n<p>[Nanjing Heyuan Electric Power Industry Co., Ltd.] Proyecto de reubicaci\u00f3n e instalaci\u00f3n de postes de 10 kV para las secciones de licitaci\u00f3n 3 y 4 de la construcci\u00f3n de la autopista Ligao.<\/p>\n<p>Wuhu Jinghu District 2022 Old Residential Area Reconstruction and Supporting Road Pole Relocation Project [Wuhu Mingyuan Group Co.<\/p>\n<p>[Anqing Development Zone Electric Power Co., Ltd.] Proyecto de migraci\u00f3n de postes de la l\u00ednea Laofeng 16 de 10 kv #29-32<\/p>","protected":false},"excerpt":{"rendered":"<p>[Nanjing Yuaneng Electric Power Engineering Co., Ltd.] Nanjing Jiangbei Environmental Protection Industry Development Co., Ltd. 35kV Power Plant #1 and #2 Pole Line Migration Project [Guogang E-commerce Technology Co., Ltd.] Nanjing Jiangning Economic and Technological Development Group Co., Ltd. &#8220;10KV Sijia Line and 10KV Taiwan Division Line 01-14 Pole Relocation Project&#8221; [Feixi Branch of Hefei [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1103,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1101","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-engineering-case"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/posts\/1101","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/comments?post=1101"}],"version-history":[{"count":0,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/posts\/1101\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/media\/1103"}],"wp:attachment":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/media?parent=1101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/categories?post=1101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/tags?post=1101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}