{"id":1102,"date":"2025-02-18T11:10:14","date_gmt":"2025-02-18T03:10:14","guid":{"rendered":"https:\/\/zhengrui-electric.com\/state-grid-class-1-state-grid-power-transmission-and-transformation_nanjing-zhengrui\/"},"modified":"2025-04-24T11:13:07","modified_gmt":"2025-04-24T03:13:07","slug":"state-grid-class-1-state-grid-power-transmission-and-transformation_nanjing-zhengrui","status":"publish","type":"post","link":"https:\/\/www.zhengrui-electric.com\/es\/state-grid-class-1-state-grid-power-transmission-and-transformation_nanjing-zhengrui\/","title":{"rendered":"State Grid Clase 1-Red Estatal de Transmisi\u00f3n y Transformaci\u00f3n de Energ\u00eda_Nanjing Zhengrui"},"content":{"rendered":"<p>[State Grid Jiangsu] Proyecto de ampliaci\u00f3n del transformador principal n\u00ba 2 de la subestaci\u00f3n de 110 kV de Shicun<\/p>\n<p>[State Grid Jiangsu] Proyecto de Reconstrucci\u00f3n del Transformador Principal de la Subestaci\u00f3n N.\u00ba 1 de 110 kV de Jiangsu Nanjing Fengxiang Contrataci\u00f3n General<\/p>\n<p>[State Grid Jiangsu] Reconstrucci\u00f3n del disyuntor de 110 kV del transformador Wanshou de 110 kV de Nanjing<\/p>\n<p>[State Grid Jiangsu] Autotransformaci\u00f3n integral de la subestaci\u00f3n de 110 kV de Dongshan de Nanjing<\/p>\n<p>[State Grid Jiangsu] Transformador Nanjing 110kV Baguazhou Transformador principal #1 y sustituci\u00f3n de bancos de condensadores #1 y #2<\/p>\n<p>[State Grid Jiangsu] Nanjing Lishui Operaci\u00f3n y mantenimiento Transformador Honglan de 110 kV, Transformador Jingqiao y Transformador Wushan Retirada de pantallas de CA<\/p>\n<p>[State Grid Jiangsu] Autorenovaci\u00f3n del transformador Lion Tree de 35 kV de State Grid Jiangsu Nanjing Gaochun<\/p>\n<p>[State Grid Jiangsu] Autotransformaci\u00f3n integral del bosque puente de 35 kV de State Grid Jiangsu Nanjing<\/p>\n<p>[State Grid Jiangsu] Reparaci\u00f3n del seccionador exterior de 10 kV del transformador Dongping de 35 kV de Lishui<\/p>\n<p>[State Grid Jiangsu] 35kV Qin Xian y Yongning Subestaci\u00f3n #1#2 Transformador Principal Reparaci\u00f3n de Asignaci\u00f3n<\/p>\n<p>[State Grid Jiangsu] State Grid Nanjing Power Supply Company Lishui 35kV Zhetang Substation Comprehensive Self-renovation<\/p>\n<p>[State Grid Jiangsu] Sustituci\u00f3n del armario de distribuci\u00f3n de 10 kV del transformador Longpao de 35 kV de State Grid Jiangsu Nanjing<\/p>\n<p>[State Grid Jiangsu] Jiangsu Nanjing Fisherman's Song ~ Proyecto de enganche de torre de l\u00ednea de 110 kV de Baima<\/p>\n<p>[State Grid Jiangsu Electric Power Co. Sucursal de Suministro El\u00e9ctrico del Distrito de Nanjing Lishui]. State Grid Jiangsu Nanjing 2020 Lishui 110kV y por debajo de la subestaci\u00f3n de producci\u00f3n t\u00e9cnica de renovaci\u00f3n y revisi\u00f3n de proyecto de construcci\u00f3n proyecto marco<\/p>\n<p>[State Grid Jiangsu Electric Power Co. Nanjing Lishui District Power Supply Branch]. State Grid Jiangsu Nanjing 2021 Lishui 110kV and Below Transmission Production Technical Transformation Overhaul Construction Project Proyecto Marco de Construcci\u00f3n<\/p>\n<p>[State Grid Jiangsu Electric Power Co. Sucursal de Suministro de Energ\u00eda del Distrito de Nanjing Lishui]. State Grid Jiangsu Nanjing 2022 Lishui 110kV Power Transmission and Transformation Producci\u00f3n Technical Transformation Overhaul Marco de Construcci\u00f3n<\/p>\n<p>[State Grid Jiangsu Electric Power Co., Ltd. Nanjing Power Supply Branch] State Grid Jiangsu Nanjing 2022 110kV Transmission Production Technical Transformation Overhaul Construction Project Proyecto marco de construcci\u00f3n<\/p>\n<p>[State Grid Jiangsu Nanjing 2018 220kV Yin Xiang Transformer 110kV Interval Circuit Breaker Replacement<\/p>\n<p>[Nanjing Yuanneng Electric Power Engineering Co., Ltd.] Ampliaci\u00f3n de la capacidad del transformador Orchid de 110 kV - Proyecto de contrataci\u00f3n general<\/p>","protected":false},"excerpt":{"rendered":"<p>[State Grid Jiangsu] No. 2 Main Transformer Expansion Project of 110 kV Substation in Shicun [State Grid Jiangsu] Jiangsu Nanjing Fengxiang 110kV Substation No.1 Main Transformer Reconstruction Project General Contracting [State Grid Jiangsu] 110kV Circuit Breaker Reconstruction of Nanjing 110kV Wanshou Transformer [State Grid Jiangsu] Nanjing 110kV Dongshan Substation Comprehensive Self-transformation [State Grid Jiangsu] Nanjing [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1105,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1102","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-engineering-case"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/posts\/1102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/comments?post=1102"}],"version-history":[{"count":0,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/posts\/1102\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/media\/1105"}],"wp:attachment":[{"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/media?parent=1102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/categories?post=1102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zhengrui-electric.com\/es\/wp-json\/wp\/v2\/tags?post=1102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}